30-60-90 Onboarding Plan
Full-Stack Developer (Product) — First Engineering Hire at Fortini Studio
Executive summary
This plan guides Fortini Studio's first-ever engineering hire from day one to full ownership within a quarter, anchored around three checkpoints: shipping a first feature by day 30, owning the credit-wallet module by day 60, and leading an end-to-end feature while halving the bug backlog by day 90. It gives Marina Costa (CTO) and the new hire a shared, concrete map of expectations, check-ins, and success criteria so the studio's move toward a productized model has solid engineering footing from the start.
01Why This Plan Exists
Fortini Studio is shifting from bespoke brand-and-web services toward a productized model, and this new Full-Stack Developer is the first dedicated engineering hire the studio has ever made. There is no existing engineering playbook to inherit — Marina Costa (CTO) has been doing double duty as both strategist and sole builder. This plan exists to compress the ramp-up time, give the new hire a clear runway to real ownership, and make sure the studio's tiny (2–10 person) team doesn't lose momentum during the transition.
Because this is a foundational hire, success isn't just "did the tickets get done" — it's whether the studio now has a second person capable of carrying product engineering independently by the end of the quarter. This is a trust-building and infrastructure-building 90 days as much as a feature-shipping one.
Manager: Marina Costa, CTO Core tools: Linear (project tracking), GitHub (code), Vercel (deploys), Figma (design handoff), Slack (day-to-day comms)
02Pre-Day-1 Checklist (Manager-Owned)
Marina should complete these before the new hire's first day so momentum isn't lost to setup friction.
| Item | Owner | Deadline |
|---|---|---|
| GitHub org invite + repo access (read/write on core repos) | Marina | 3 days before start |
| Linear workspace invite, added to active cycle | Marina | 3 days before start |
| Vercel team invite (staging + preview deploy access) | Marina | 3 days before start |
| Figma seat + access to active brand/product files | Marina | 3 days before start |
| Slack invite + intro post in main channel | Marina | Day 1 morning |
| 1-page "How We Work" doc (branching strategy, PR conventions, deploy process) | Marina | 2 days before start |
| Laptop/dev environment setup instructions sent | Marina | 5 days before start |
| First-week calendar blocked (1:1s, shadow sessions, no external client calls) | Marina | 3 days before start |
Assumption flagged: since Fortini has no prior engineering hires, there is likely no formal codebase style guide or onboarding doc yet — this plan assumes Marina will draft a lightweight one before day 1 rather than relying on the new hire to reverse-engineer conventions.
03Days 1–30: Orientation & First Ship
Theme: Learn the codebase, the client-facing product surface, and the team's rhythm — then ship something small but real to prove the loop works end to end (code → review → deploy).
Week 1 — Immersion
- Full environment setup; first successful local run of the app and a test deploy to Vercel preview.
- Pair with Marina on 2–3 existing tickets to observe conventions (branching, PR review style, Linear workflow).
- Read through the current product's core flows as a user would — brand intake, project delivery, and any existing credit/billing logic.
- Meet every contractor the new hire will interact with (design, client ops) via a short intro call each.
Week 2 — Guided contribution
- Pick up 2–3 small, well-scoped bugs or polish tickets from the Linear backlog, self-assigned with Marina's sign-off.
- Submit first PR by end of week 2; expect it to go through at least one round of review — this is normal, not a red flag.
- Start a personal "questions log" in Slack DM with Marina rather than blocking on every small doubt in real time.
Weeks 3–4 — First independent feature
- Own one small, self-contained feature or improvement (e.g., a UI polish item, a small automation, or an admin-facing utility) from ticket to deploy with minimal hand-holding.
- Write the PR description and testing notes without prompting — this is the first real signal of independent judgment.
- Day 30 success criteria: ships first small feature to production; understands the full deploy pipeline (GitHub → Vercel); can navigate Linear and Figma independently; has a working mental model of the credit-wallet module's current state (even if not yet touching it directly).
| Milestone | Target Date | Owner |
|---|---|---|
| Dev environment fully working | Day 2 | New hire |
| First PR merged | Day 10–12 | New hire |
| First feature shipped to production | Day 25–30 | New hire, reviewed by Marina |
| 30-day check-in & written feedback | Day 30 | Marina |
04Days 31–60: Ownership of the Credit-Wallet Module
Theme: Move from "contributor on assigned tickets" to "owner of a defined product area." The credit-wallet module — central to Fortini's productized-model ambitions — becomes this hire's primary responsibility.
Weeks 5–6 — Deep dive and audit
- Full walkthrough of the credit-wallet module's current code, data model, and known issues with Marina (budget a dedicated 2-hour session, not a rushed handoff).
- Produce a short written audit: what works, what's fragile, what's undocumented. This becomes the roadmap for the next four weeks and doubles as a demonstration of technical judgment.
- Take over triage of all new credit-wallet-related bugs and feature requests in Linear.
Weeks 7–8 — Real ownership
- Ship at least one meaningful improvement or fix to the credit-wallet module independently, from spec to deploy.
- Become the default point of contact for any credit-wallet question in Slack — Marina should visibly redirect questions this hire's way to reinforce the ownership shift.
- Begin contributing lightweight documentation for the module (even a single README is a big step up from institutional-knowledge-only).
Day 60 success criteria: the new hire is the clear owner of the credit-wallet module — able to scope, prioritize, and ship changes to it without Marina's line-by-line involvement; Marina's role shifts to review and strategic input only.
| Milestone | Target Date | Owner |
|---|---|---|
| Credit-wallet audit doc delivered | Day 40 | New hire |
| First independent credit-wallet ship | Day 50 | New hire |
| Module documentation started | Day 55 | New hire |
| 60-day check-in & written feedback | Day 60 | Marina |
05Days 61–90: End-to-End Leadership & Backlog Reduction
Theme: Prove the hire can lead, not just execute — taking a feature from idea to shipped product, and simultaneously restoring engineering hygiene by cutting the bug backlog in half.
Weeks 9–10 — Feature leadership
- Select (with Marina) one meaningful, client-visible feature to lead end-to-end: scoping, breaking into tickets, sequencing work, and driving it to launch. This should be something with real product weight — not a maintenance task.
- Run a short kickoff (even informal, over Slack or a 20-minute call) to align Marina and any contractors on the plan before building.
- Start weekly written progress notes in Linear so status is visible without needing a live meeting.
Weeks 11–12 — Delivery and cleanup
- Ship the led feature to production, including a short post-launch note on what shipped and what's next.
- In parallel, run a structured pass on the bug backlog: triage every open bug in Linear, close stale/invalid ones, batch-fix quick wins, and schedule the rest. Target is a 50% reduction in open bug count from the day-60 baseline.
- Propose one process or tooling improvement based on the first 90 days (e.g., a PR template, a Linear label scheme, a lightweight testing checklist) — a strong signal of ownership beyond just code.
Day 90 success criteria: led a feature end-to-end from scoping to shipped, with visible planning artifacts in Linear; bug backlog reduced by at least 50% from the day-60 count; functioning as a genuine engineering partner to Marina rather than a task-taker.
| Milestone | Target Date | Owner |
|---|---|---|
| Feature scoped and kicked off | Day 65 | New hire, aligned with Marina |
| Bug backlog triage complete | Day 75 | New hire |
| Led feature shipped to production | Day 85 | New hire |
| Backlog reduced ≥ 50% vs. Day 60 baseline | Day 90 | New hire |
| 90-day review & forward-looking goals set | Day 90 | Marina |
06Check-In Cadence
Given the size of the team, check-ins should be light on ceremony but consistent — missed 1:1s are the fastest way to lose trust in a two-partner studio.
| Period | Cadence | Format |
|---|---|---|
| Weeks 1–2 | 2x per week (15–20 min) | Async Slack check + one live call |
| Weeks 3–8 | Weekly (30 min) | Live call, agenda-free — surface blockers and wins |
| Weeks 9–12 | Weekly (30 min) + Day 90 review (60 min) | Live call + written 90-day review doc |
| Ongoing after Day 90 | Biweekly | Standard 1:1 rhythm |
At each of the three major checkpoints (Day 30, 60, 90), Marina should deliver written feedback, not just verbal — a few paragraphs covering what's going well, what needs to shift, and what "good" looks like for the next 30 days. This matters more in a 2-person leadership team than in a large org, since there's no HR buffer or peer manager to catch drift.
07Success Scorecard
Use this scorecard at each 30-day checkpoint to keep the conversation concrete rather than impression-based.
| Dimension | Day 30 Target | Day 60 Target | Day 90 Target |
|---|---|---|---|
| Shipping | First small feature live | Independent credit-wallet ships | Led feature shipped end-to-end |
| Ownership | Follows existing conventions | Owns credit-wallet module | Owns a full feature lifecycle |
| Codebase fluency | Can navigate repo unaided | Can explain wallet module fully | Contributes to architecture decisions |
| Collaboration | Asks good questions, low blocking | Proactively unblocks Marina | Coordinates contractors independently |
| Process hygiene | Uses Linear/GitHub correctly | Documents wallet module | Proposes a process improvement |
| Bug backlog | N/A (baseline established) | Baseline count recorded | Reduced by ≥ 50% vs. Day 60 |
If any dimension is significantly behind at a checkpoint, that's the trigger for an honest conversation about support needed — not a silent mark against the hire.
08Manager's Role Across the Quarter
Marina's involvement should shrink deliberately over the quarter — this is as much a test of delegation as it is of the new hire's ramp.
- Days 1–30: High involvement. Pair frequently, review every PR, answer questions same-day.
- Days 31–60: Medium involvement. Review at milestones, not every commit; let the new hire drive the credit-wallet audit and roadmap.
- Days 61–90: Light-touch. Act as sounding board and unblocker, not approver-of-record for day-to-day decisions.
Because Fortini has just two partners, Marina should also protect time on her own calendar for this — onboarding a first engineering hire well is a strategic investment in the studio's productized future, not a side task squeezed between client work.
Assumptions made
- No formal engineering onboarding documentation or style guide exists yet at Fortini Studio; Marina is assumed to draft a lightweight one before the hire's start date.
- The credit-wallet module already exists in some form (even if immature/undocumented) and is not being built from scratch.
- The new hire has prior full-stack experience and does not need training on fundamentals — only on this codebase and product context.
- "Bug backlog" refers to open issues tracked in Linear; the Day 60 count is assumed as the baseline for the Day 90 50% reduction target.
- Team size (2 partners + contractors) means no dedicated HR/People function exists, so Marina (CTO) owns all onboarding logistics described here.
- Compensation, benefits, and legal employment terms are out of scope for this plan and are assumed to be handled separately.